Certified Sovereign Fit Audit Included

Comprehensive engineering validation for local ML infrastructure. Complete the technical questionnaire below to route your VRAM, thermal, and dataset requirements directly to our engineering team.

Audit Deliverables & Technical Scope

Thermal Duty-Cycle Analysis

We model your specific inference workload against UK ambient temps to ensure zero-throttling on Blackwell/Ada architectures under continuous 100% compute cycles.

Technical diagram of an AIO liquid cooling loop showing hot coolant flowing from a water block on a chip to a dual-fan radiator and returning cooled

Workload (TOPS) vs. TDP Heat Dissipation. Validated Ambient Threshold: 21°C.

VRAM Residency Mapping

Precise hardware selection based on your model parameters (70B+, MoE) and quantization needs (FP4/FP8/INT8) to completely eliminate Out-of-Memory (OOM) faults across our 192GB VRAM dual-GPU arrays

Isometric illustration of a layered hexagonal cube showing three stacked memory tiers in orange, green, and blue with binary data flowing between them

Model Residency (70B+ parameters). KV Cache & Batch Overhead. Physical VRAM Limit Mapping.

HMRC R&D Compliance

We provide a granular technical engineering breakdown for your finance lead to maximize UK R&D Tax Relief and Capital Allowances (Full Expensing) claims.

Three-panel infographic showing hardware components, technical documentation with charts and gears, and financial records with currency symbols

Technical BOM (Bill of Materials). R&D Justification Report. Capital Allowances Compliance Pack.

Priority Allocation

Your audit secures a Tier 1 slot in our next hardware intake—crucial for securing Blackwell 50-series units during UK shortages.

Isometric illustration contrasting two fast blue trains on an elevated track with a queue of cars, vans, and trucks crawling along a standard road

Tier 1 Procurement Queue. 50-Series Reservation. Sovereign Infrastructure Intake Timeline.

(*) Alon Products Ltd is not a registered tax advisor or financial institution. Technical Utility Statements are provided for informational engineering purposes only. Consult a chartered accountant to verify eligibility for ERIS/AIA claims under HMRC guidelines.